Library Park Phase 2

Library Park Phase 2

  • During 2020 and 2021 Library Park went through major renovations upgrading the irrigation system, lighting, pathways and park enhancements.
  • SLR has been hired to evaluate the condition of the parking lot drainage system between the Library and City Hall and the rear and east terraces of library building.
  • SLR will also provide plans and specifications for the contruction of the parking lot and terraces.  This design and picks up from renovation of the Library Park completed in early 2021.