https://drive.google.com/file/d/10k9JTDZhXfdofjl2e8Mit1jUCVwBoX5Y/view?usp=share_link
The construction of the Exchange Place Utility Improvements North Main Street, South Main Street, Bank Street Project is currently underway.
This is notice of a Grand Street Eastbound Closure between Bank Street and South Main Street.
BANK STREET EASTBOUND CLOSURE:
- Detour traffic right from Grand Street onto Bank Street South.
- Detour left on Market Street, continue as it remains Market Street (Bare left)
- Detour left onto South Main Street
- The contractor has placed Detour Signage and variable message signs along these streets. Please see attached map
- This detour will be in place for three days starting on April 19, 2023.